A custom circular boiler was fabricated and assembled to meet the client’s technical requirements.

Duration:
5 Days

technical overview

Circular Boiler Fabrication
Duration: 5 Days

A custom circular boiler was fabricated and assembled to meet the client’s technical requirements. The scope of work included steel plate preparation, precision welding, structural assembly, and comprehensive quality checks. The project was successfully delivered on schedule, ensuring reliability and long-term performance in demanding operating conditions.