A custom circular boiler was fabricated and assembled to meet the client’s technical requirements.
Duration:
5 Days
technical overview
Circular Boiler Fabrication Duration: 5 Days
A custom circular boiler was fabricated and assembled to meet the client’s technical requirements. The scope of work included steel plate preparation, precision welding, structural assembly, and comprehensive quality checks. The project was successfully delivered on schedule, ensuring reliability and long-term performance in demanding operating conditions.